6Goldratt,E.M.Theory of Constraints[M].North RiverPress,1990.
7Chakravorty,S.S.,Atwater,B.The Impact of FreeGoods on the Performance of Drum-Buffer-RopeScheduling Systems[J].International Journal ofProduction Economics,2004,95(3):1-11.
8Goldratt,E.M.It's Not Luck[M].North RiverPress,1994.