基于多Agent的柔性作业车间预先/重调度系统 被引量:5

A Flexible Job Shop Pre/re-scheduling System Based on Agent
下载PDF
导出
摘要 针对柔性作业车间动态调度受到来自外部的随机干扰问题,运用多Agent方法,以平均滞后和开始时间背离为主要目标函数,提出了基于柔性作业车间调度问题的预先/重调度方法,并通过Agent之间的协商来达到系统优化。运用Java语言实现调度系统并进行仿真实验分析,通过与Jain的遗传算法和传统的right-shift重调度方法比较,显示了所提出方法的优越性。 For the problem of random interference from the outside for dynamic scheduling of flexible job shop,a pre/re-scheduling approach was proposed while multi-Agent approach was used and the mean tardiness and the deviation of start time were taken as main objective functions.The method was based on flexible job shop scheduling,and it was system optimized by the negotiation among Agents.Finally,the system was implemented in Java on the Eclipse platform.By the comparison with the genetic algorithm of Jain and the traditional right-shift rescheduling method,the results show that the proposed method significantly outperforms traditional dispatching rules.
出处 《武汉理工大学学报(信息与管理工程版)》 CAS 2012年第1期69-73,共5页 Journal of Wuhan University of Technology:Information & Management Engineering
关键词 预先/重调度 机器故障 急件到达 多AGENT pre/re-scheduling failure machine urgent part to reach multi-Agent
  • 相关文献

参考文献9

  • 1VIEIRA G E, HERRMANN J W, LINE. Rescheduling manufacturing systems : a framework of strategies, poli- cies, and methods [ J ]. Journal of scheduling, 2003 (6) :39 -62.
  • 2ABUMAIZAR R J, SVESTKA J A. Rescheduling job shops under random disruptions [ J]. International Journal of Production Research, 1997,35 (7) :2065 - 2082.
  • 3JAIN A K, ELMARAGHY H A. Production scheduling/ rescheduling in flexible manufacturing [ J ]. International Journal of Production Research, 1997,35 ( 1 ) :281 - 309.
  • 4WONG T N, LEUNG C W, MAK K L, et al. Integrated process planning and scheduling/rescheduling - an a- gent -based approach[ J]. International Journal of Pro- duction Research,2006,44 ( 15 ) :3627 - 3655.
  • 5WONG T N, LEUNG C W, MAK K L, et al. An agent - based negotiation approach to integrate process plan- ning and scheduling [ J ]. Im J Prod Res ,2006,44 (7) : 1331 - 1351.
  • 6任海英,邹艳蕊.基于多Agent协商的柔性车间调度系统[J].微计算机信息,2011,27(1):14-16. 被引量:3
  • 7CHURCH L K, UZSOY R. Analysis of periodic and e- vent - driven rescheduling policies in dynamic shops [ J ]. International Journal of Computer Integrated Man- ufacturing, 1992,5 ( 3 ) : 153 - 163.
  • 8CHRYSSOLOURIS G,PIERCE J E,DICKE K. A decision -making approach to the operation of flexible manufac- turing systems [ J ]. The International Journal of Flexible Manufacturing Systems, 1992,3 (4) :309 - 330.
  • 9SIWAMOGSATHAM T, SAYGIN C. Auction - based distributed scheduling and control scheme for flexible manufacturing systems [ J ]. Int J Prod Res, 2004,42 (3) :547 - 572.

二级参考文献6

  • 1Smith R G. The contract net protocol: High-level communication and control in a distributed problem solver [J]. IEEE TRANS- ACTIONS ON COMPUTERS, 1980, C-29(12): 1104 - 1113.
  • 2Lin, G.Y.J. and Solberg, J.J. Integrated shop floor control using autonomous agents [J]. IIE Trans., 1992, 24: 57-71.
  • 3Krothapalli, N. and A.V. Deshmukh. Design of negotiation protocols for multi-agent manufacturing systems[J].International Journal of Production Research, 1999, 37(7): 1601-1624.
  • 4Wong, T.N., Leung, C.W., Mak, K.L. et al. An agent-based negotiation approach to integrate process planning and scheduling[J]. International Journal of Production Research, 2006. 44 (7): 1331- 1351.
  • 5Caprihan, R. and Wadhwa, S. Impact of routing ?exibility on the performance of an FMS -- a simulation study [J]. International Journal of Flexible Manufacturing Systems, 1997, 9:273 - 298.
  • 6吕涛,闫志华.应用混合算法求解柔性车间调度问题[J].微计算机信息,2009,25(18):205-207. 被引量:2

共引文献2

同被引文献62

引证文献5

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部