期刊文献+

选煤厂装车系统高效化升级改造 被引量:3

High Efficient Upgrade of Loading System in the Coal Preparation Plant
下载PDF
导出
摘要 选煤厂装车系统,作为矿井产品煤外运的关键部位,随着矿井产量的逐年提升,装车系统部分环节能力不足的问题日益凸显,为此,成庄矿洗选厂对装车系统进行高效化升级改造,不仅优化了装车系统,也满足成庄矿千万吨能力精品矿井的需要。 The loading systems of the coal preparation plant, as a key part of coal outward transport in the coal mine, along with increasing of the mine yield year by year, the problem which the part link capacity of loading system is insufficient increasingly outstand, therefore, Chengzhuang coal preparation plant carry out high efficiency upgrading transformation to the loading system, not only optimize the loading system, also meet the needs high -quality goods mine of ten million tons capacity in Chengzhuang coal mine.
作者 常转堂
出处 《山西焦煤科技》 2012年第1期48-50,共3页 Shanxi Coking Coal Science & Technology
关键词 选煤厂 装车系统 高效化 升级改造 Coal preparation plant Loading system High efficiency Upgrade
  • 相关文献

同被引文献29

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部