期刊文献+

基于系统分析的炼钢连铸重调度框架 被引量:1

下载PDF
导出
摘要 针对炼钢连铸生产过程受动态扰动因素的影响而使得初始调度不可行的情况,应用系统分析方法,从扰动因素、策略、方法以及性能评价4个层次提出了基于系统分析的炼钢连铸重调度框架,并对框架中的研究内容展开了深入分析和讨论,以期为企业管理者决策时提供依据和参考。
出处 《中国管理信息化》 2012年第4期53-55,共3页 China Management Informationization
  • 相关文献

参考文献9

  • 1Djamila Ouelhadj. A Multi-Agent System for the Integrated Dynamic Scheduling of Steel Production [D]. Nottingham: University of Nottingham, 2003.
  • 2常春光,胡琨元,汪定伟,郑秉霖,李慧莹.钢铁生产动态调度理论研究与工程应用综述[J].信息与控制,2003,32(6):531-537. 被引量:28
  • 3Tang Lixin, Wang Xianpeng. A Predictive Reactive Scheduling Method for Color-Coating Production in Steel Industry [J]. The International Journal of Advanced Manufacturing, 2008, 35 (7/8) : 633-645.
  • 4Cowling P, Ouelhadj D, Petrovic S. A Multi-Agent Architecture for Dynamic Scheduling of Steel Hot Rolling [J]. Journal of Intelligent Manufacturing, 2003, 14(5): 457-470.
  • 5许剑,吕志民,徐金梧,朱志荣,王岺.DHCR和DR一体化计划调度的体系结构研究及应用[J].钢铁,2005,40(12):55-58. 被引量:5
  • 6庞新富,俞胜平,刘炜,郑秉霖,柴天佑.炼钢连铸动态智能调度系统的研究与开发[J].控制工程,2005,12(6):553-556. 被引量:21
  • 7Subramaniam V, Raheja A S. mAOR: A Heuristic-Based Reactive Repair Mechanism for Job Shop Schedules [J]. International Journal Advanced Manufacturing Technology, 2003, 22(9/10): 669-680.
  • 8Vieira G E, Herrmann J W, Lin E. Rescheduling Manufacturing Systems: A Framework of Strategies, Policies, and Methods [J]. Journal of Scheduling, 2003,6( 1 ) :39-62.
  • 9Abumaizar R J, Svestka J A. Rescheduling Job Shops under Random Disruptions [J ]. International Journal of Production Research, 1997, 35 (7) : 2065-2082.

二级参考文献37

  • 1唐立新,杨自厚,王梦光.钢铁企业CIMS特点和体系结构的研究[J].冶金自动化,1996,20(4):20-23. 被引量:28
  • 2Lixin Tang,Jiyin Liu,Aiying Rong,etal.A Review of Planning and Scheduling Systems and Methods for Integrated Steel Production[J].European Journal of Operational Research,2001,(133):1-20.
  • 3Iiro Harjunkoski,Ignacio E Grossmann.A Decomposition Approach for the Scheduling of a Steel Plant Production[J].Computers and Chemical Engineering,2001,25 (11-12):1647-1660.
  • 4Jackson J R.Simulation research on job shop production[J],1957(04).
  • 5Redwine C N;Wismer D A.Mixed integer programming model for scheduling orders in a steel mill[J],1974(09).
  • 6Sato S;Yamaoka T;Aoki Y.Development of integrated scheduling system for iron and steel works,1977(11).
  • 7Shah M J;Damian R;Silverman J.Knowledge based dynamic scheduling in a steel plant[C],1990.
  • 8Dagli C;Huggahalli R.A neural network architecture for faster dynamic scheduling in manufacturing systems[C],1991.
  • 9Khalid K.Using multi-agent architecture in FMS for dynamic scheduling,1997(08).
  • 10Kondakci S;Gupta R M.Interactive approach for a dual-constraint job shop scheduling problem,1991(03).

共引文献45

同被引文献12

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部