摘要
在总结综合自动化系统现场调试的经验基础之上,整理了现场调试步骤及注意事项。现场调试按时间大致分为前期准备阶段、调试阶段、试运行阶段、调试收尾阶段。前期准备阶段主要是对变电所一次设备、二次设备进行初步了解,全面掌握综自系统性能、具体装置、单屏功能,达到进行系统调试的要求。
In summing up the integrated automation system debugging experience foundation, finishing the scene debugging steps and matters needing attention.Site commissioning time is broadly divided into the preparation phase,commissioning,trial run,commissioning the finishing stage.The preparation phase is mainly for substation primary equipment,two equipment to conduct a preliminary understanding,grasp since the system performance,the specific device,single screen function,reach the requirements of system debugging.