期刊文献+

河涌底泥测量与清淤量计算方法比较 被引量:1

Comparison on methods for calculating of the dredging volume with underwater surveying data in a polluted river
下载PDF
导出
摘要 采用声学多普勒水流剖面仪(ADCP)对麻涌河清淤前后水下地形进行测量,并结合实时动态GPS测量技术,通过相关软件获取清淤前后河底高程,然后分别应用AutoCAD、Excel常规软件法和南方CASS6.1测绘软件法对麻涌河清淤量进行模拟计算。通过对两种计算方法的结果分析比较,表明南方CASS6.1法从计算耗时和准确度而言更具优势。 Acoustic doppler current profilers was used for surveying underwater topography of Machong river before and after dredging, combined with realtime kinematic GPS technology, acquiring river bed elevation via relevance software. Then, AutoCAD, Excel, Google Earth and South CASS6. 1 were separately applied to simulate the calculation of dredging volume of Machong river. The results show that the CASS 6.1 is with higher efficiency and more accurate.
出处 《工程勘察》 CSCD 2012年第2期88-91,共4页 Geotechnical Investigation & Surveying
关键词 底泥 清淤 水下测量 污染河流 sediment dredging bathymetric surveying polluted river
  • 相关文献

参考文献9

二级参考文献39

共引文献35

同被引文献5

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部