期刊文献+

钢管混凝土栓钉柱脚节点抗冲切性能试验研究

EXPERIMENTAL RESEARCH ON RESISTING PUNCHING BEHAVIOR OF THE COLUMN FOOTING NODE OF CFST COLUMN WITH STUDS
原文传递
导出
摘要 通过拟静力试验方法研究静力荷载作用下带有栓钉的钢管混凝土柱埋入钢筋混凝土基础梁式柱脚节点的冲切破坏机制,冲切面位置及影响冲切承载力的因素等。研究表明:在钢管外焊接栓钉后,冲切破坏面的上边缘由钢管底部移至最上排栓钉处,扩大了混凝土冲切面积,有效地提高了构件的抗冲切承载力,当栓钉数量足够且布置合理时,柱脚的抗冲切能力可以大于抗剪能力,使柱脚节点设计满足抗弯、抗剪要求,保证构件安全。 It was studied the punching failure mechanism, position of blunted cut, and the influence of punching hearing capacity factors of node of the column footing in beam form of CFST column with studs embedding in the reinforced concrete foundation under static loading through quasi-static method. The research showed that punching area of the concrete extended because the upper edge of punching area moved from the bottom of steel tube to the highest studs ,which improved the bearing capacity of resisting punching of the component after welding studs outside the steel tube. When the number of the studs is enough and their layout is reasonable, the bearing capacity of resisting punching of the column footing can be greater than the capacity of resisting shear. The safety of the components can be ensured if the column footing node meets the flexural and shear requirement.
出处 《工业建筑》 CSCD 北大核心 2012年第2期115-119,共5页 Industrial Construction
基金 陕西省自然科学基金项目(2006E208) 西部建筑抗震勘察设计研究院科技基金项目
关键词 钢管混凝土 栓钉 柱脚节点 冲切 试验研究 CFST studs column footing joint punching experimental research
  • 相关文献

参考文献9

二级参考文献11

  • 1肖桂兰,肖文斌.哈尔滨联通电信枢纽大厦钢管混凝土柱定位及偏差控制[J].哈尔滨工业大学学报,2003,35(z1):192-195. 被引量:5
  • 2崔化亮,肖文斌.哈尔滨联通通信枢纽大厦工程介绍[J].哈尔滨工业大学学报,2003,35(z1):196-199. 被引量:1
  • 3黄翔宇,石少卿,尹平,刘颖芳.高强钢管混凝土短柱轴压承载力试验和有限元分析[J].四川建筑科学研究,2005,31(3):39-41. 被引量:8
  • 4滕智明,邹离湘.反复荷载下钢筋混凝土构件的非线性有限元分析[J].土木工程学报,1996,29(2):19-27. 被引量:49
  • 5KAWAGUCHI J, MORINO S. Experimental study on strength and stiffness of bear type CFT column base with central reinforcing bars[J]. Composite Construction in Steel and Concrete, 2006, V(N).
  • 6Fujinaga T, Matsui C,Tsuda K, et al. Limiting axial compressive force and structural performance of concrete rilled steel tubular beam-columns [ J ]. Proceedings of Fifth Pacific Structural steel Conference, 1998 (2) :979-984.
  • 7Amit H Varma, James M Riclesm, Richard Sause, et al. Seismic behavior and modeling of high-strength composite concretefilled steel tube(CFT) beam-columns [ J]. Journal of Constructional Steel Research, 2002,58:725-758.
  • 8中华人们共和国国家质量监督检验检疫总局,中国国家标准化管理委员会.GB/T2651-2008焊接接头拉伸试验方法[S].北京:中国标准出版社,2008.
  • 9北京市建筑设计研究院.CECS43:92钢筋混凝土装配整体式框架节点与连接设计规程[S].北京:中国建筑工业出版社,1994.
  • 10中华人民共和国建设部 国家质量监督检验检疫总局.GB50010-2002混凝土结构设计规范[S].北京:中国建筑工业出版社,2002.17.

共引文献2760

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部