就40t/d 盐酸生产合成炉至石墨冷却器间空气冷却管的设置、管径及管长进行了设计计算。经生产检验设计合理,操作稳定。
For a 40 t/d hydrochloric acid production system,a size calculation of air cooling pipe between the synthesis furnace and graphite cooler was made.The practical production has proved that the calculation was reasonable and stable operation was brought about by its application
出处
《氯碱工业》
CAS
2000年第1期37-39,共3页
Chlor-Alkali Industry
关键词
盐酸生产
空气冷却管
冷却管
hydrochloric acid,production,air cooling,pipe,design