摘要
对取消石灰软化工艺前后的工业水状况进行对比和分析,评价工业水处理运行的经济效果,分析脱盐和循环水装置的运行现状。
This paper compares and analyzes the operation of the industrial water before and after the lime softening process cancelled, evaluates the economical effect of the new process,and analyses the existing operation of desalting units and circulating water units
出处
《大氮肥》
CAS
2000年第1期14-16,共3页
Large Scale Nitrogenous Fertilizer Industry
关键词
石灰软化
脱盐
循环水
氮肥
水处理
lime softening process,cancel,desalting,circulating water