摘要
结合西安市地铁二号线设计实例,针对地面沉降槽对地铁建设的影响,提出了有效的处理措施。该措施基本上解决了沉降槽对地铁建设可能带来的危害,可为类似工程建设提供参考。
Combining with the design example of Xi' an subway Line 2, in light of the ground settling tank for the construction of subway, effective treatment measures are puts forward. The treatment measures basically have solved the harm & influence of ground settling tank in the subway' s construction and provide the reference for similar project construction.
出处
《铁道建筑技术》
2012年第1期20-24,共5页
Railway Construction Technology
关键词
地铁设计
地下水
沉降槽
metro design
underground water
the ground settling tank