摘要
在公路建设过程中,经常遇到如何向土中搀加石灰以降低土中含水量的问题,本文以试验为基础,从质量和经济两方面,其中主要是质量方面论述了在土壤中应掺加多大比例的石灰才是最佳的比例的问题。
During the course of road construction, the problem of how to add lime into soil to lessen the contents of water in the soil is often met. Based on the experiments, the author discussed how much percentage was the best choice when lime was added into the soil with the consideration of quality and economics, especially quality.
出处
《森林工程》
2000年第1期39-40,共2页
Forest Engineering