摘要
结合厦门海沧大桥悬索桥施工实例 ,对加劲梁工厂制造、运输、工地安装各阶段采用的主要施工工艺进行分析 。
Combining the construction of Haicang Suspension Bridge in Xiamen, analysis is made on the construction technology of manufacture, transportation and assembly of the stiffening girder, and problems to be solved are raised.
出处
《铁道建筑技术》
2000年第1期9-13,共5页
Railway Construction Technology
关键词
悬索桥
加劲梁
施工
厦门海沧大桥
suspension bridge, stiffening girder, construction technology