期刊文献+

海洋油气井水下井口回接装置 被引量:8

Subsea Wellhead Tieback Device for Offshore Construction
下载PDF
导出
摘要 海洋油气井水下井口回接是海洋油气井通过水下井口与海面采油平台建立采油采气通道的一种方法。介绍了回接连接装置的结构、组合式金属膨胀密封环的设计方案及其工作原理。该方案设计的装置结构简单、操作方便,为国内在海上油气井回接系统方面的研究提供新的设计思路。 Subsea wellhead tieback device is used to establish the channel which enables the oil or gas to be brought from subsea wellhead to production platform.The paper firstly introduces the structure of subsea wellhead tieback device and the design of expandable combined metal seal ring,and then discusses about working principle of the designed device.The designed subsea wellhead tieback device is simple in structure,easy to operate,and can provide a new design concept for domestic R & D of tieback system.
出处 《石油矿场机械》 2012年第1期88-90,共3页 Oil Field Equipment
关键词 水下井口 回接 工作原理 密封结构 subsea wellhead; tieback; working principle; seal structure
  • 相关文献

参考文献6

二级参考文献16

  • 1赵政璋,赵贤正,李景明,刘人和.国外海洋深水油气勘探发展趋势及启示[J].中国石油勘探,2005,10(6):71-76. 被引量:27
  • 2陈国明,殷志明,许亮斌,蒋世全.深水双梯度钻井技术研究进展[J].石油勘探与开发,2007,34(2):246-251. 被引量:63
  • 3李桂华.海洋钻井隔水管动力分析.石油学报,1994,16(1):84-88.
  • 4Robert D Crace.井喷与井控手册(Blauout and well contro C Handbook)[K].高振果,译.北京:石油工业出版社,2006.
  • 5SG-5/SG-SXP Subsea Wellhead SystemiZe. ABB Vetco Groy,2002.
  • 6UWD-15 Subsea Wellhead Systems[Z]. FMC Technologies,Inc, 2003.
  • 7SS-15^TM Subsea Wellhead Systems[Z]. Dril-Quip, Inc, 1998.
  • 8Pettingill H S, Weimer P. World-wide deepwater exploration and production: past, present and future [C]//Houston, Texas : 21 st Annual Research Confer- ence,2001.
  • 9Smith K L,Gauh A D,Witt D E,et al. Subsea mudlift drilling joint industry projeet: delivering dual gradient drilling technology to industry[G]. SPE 71357,2001.
  • 10Schumacher J P, Dowell J D, Ribbeck L R, et al. Subsea MudLift Drilling(SMD) : planning and preparation for the first subsea field test of a full. scale dual gradient drilling system at green canyon 136, Gulf of Mexico EG2. SPE 71358,2001.

共引文献36

同被引文献45

  • 1屈志明,廖伟恒,罗园,李乃峰.油气井井喷失控抢险用井口装置的研制[J].内蒙古石油化工,2020(4):100-103. 被引量:5
  • 2API RP 2A WSD 2007, Recommended Practice for Plan ning, Designing and Constructing Fixed Offshore Plat forms-Working Stress Design[S].
  • 3Mattiazzo G, Mauro S, Guinzio P S. A tensioner simula- tor for use in a pipelaying design too[J] Meehatron- ies, 2009,19(8) : 1280-1285.
  • 4Shafiq Khandoker, Greg Landthrip, Philip Huff. Struc tural optimization of subsea pressure vessel equipment for hpht application with a design by analysis case study of typical bop[G]. OTC19544,2008.
  • 5Kenneth Young,Chris Alexander, Richard Biel. Upda- ted Design Methods for HPHT Equipment[G]. SPE 97595,2005.
  • 6ASMEⅧ,压力容器建造规则[S].
  • 7Koeck F,Macfarlane D, Skeels H B. Future Considera tions for HP/HT Equipment and Systems [G] Otc18076,2006.
  • 8UWD-15SubseaWellheadSystem[Z].FMCTechnolo-gies,Inc,2003.
  • 9SG-5/SG-5XPSubseaWellheadSystem[Z].ABB Vec-toGray,2002.
  • 10SS-15TM Subsea Wellhead System[Z].Dril-Quip,Inc,1998.

引证文献8

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部