高酸性气田现场仪表典型安装方案设计优化 被引量:2

Typical installation scheme design optimization of field instruments in high sour gas field
下载PDF
导出
摘要 川东北高含硫气田项目已全部进入详细设计阶段。为了减少高酸性气田现场仪表可能存在的泄漏点,实现本质安全,清洁高效地开发高酸性气田,在常规的仪表安装设计方案的基础上,结合雪弗龙项目及普光气田的经验对现场仪表典型安装方案进行了设计优化,最大可能地减少仪表安装上的漏点,方便运行维护。该文从设计角度出发,将国内常规的仪表安装方案设计与目前项目现场仪表典型安装设计方案进行对比,并推荐出适合高酸性气田项目的设计优化方案。 CDB high sour gas field project has stepped into detail design phase completely.In order to reduce the potential leakage point,realize intrinsic safety and develop high sour gas field environmental-friendly,combined with the experience of Chevron project & Puguang gas field,CDB engineering project design team optimizes the designing scheme of field instrument typical installation on the base of regular instrument installation scheme to minimize leakage and realize maintenance convenience.The national conventional instruments installation scheme and current field instruments typical installation scheme were compared from the view of design,and the optimization designing scheme suitable for high sour gas field project was recommended.
出处 《石油与天然气化工》 CAS CSCD 2012年第1期96-98,123,共3页 Chemical engineering of oil & gas
关键词 高酸性 现场仪表 安装方案 优化 high sour,field instrument,installation scheme,optimization
  • 相关文献

参考文献3

  • 1中国石油和化学工业协会.GB50093—2002自动化仪表工程施工及验收规范[s],2003-01-10.
  • 2蒋毅,黄湛.防毒庇护所在高含硫气田中的应用[J].天然气工业,2009,29(6):117-119. 被引量:2
  • 3Installation, Inspection, Testing, and Commissioning of Instru mentation. CVX ICM--PC--5139 A.

二级参考文献7

共引文献1

同被引文献6

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部