摘要
风力发电场大量使用中压电缆,但目前电缆终端故障率较高,且一般为施工工艺控制不严所致,文章从中压电缆终端工艺控制出发,提出相应各阶段的工艺要点。
The wind farms use extensively medium-voltage cable, but cable terminal failure rate is high, usually due to inadequate control of the construction process, from the aspect of medium vohage cable termination process control, the corresponding process points for each stage are presented.
出处
《华北电力技术》
CAS
2012年第2期69-70,共2页
North China Electric Power
关键词
风电场
中压电缆
电缆终端
故障
wind farm
medium-voltage cable
cable termination
failure