三峡四期蓄水清库工程“最后一爆”——涪陵白涛旧乌江大桥拆除爆破 被引量:3

Blast for A Last Forth Time Clearing in Three Gorges Reservoir
下载PDF
导出
摘要 随着三峡水库175m蓄水,标高只有185m的涪陵白涛旧乌江大桥已不能满足通航要求,因此,该大桥的爆破是三峡清库工作至关重要的一环。涪陵白涛旧乌江大桥的成功爆破,为三峡四期蓄水清库工程扫清了最后一道障碍。文章详细论述了涪陵白涛乌江大桥爆破拆除工程中各种情况和爆破参数,为该类情况下的爆破拆除提供了经验。 As the Three Gorges Reservoir water storage level rises to 175-meter, the 185-meters Wujiang River Old Bridge in BaiTao can no longer meet the navigation requirements. Therefore, it is important to have the bridge blast away in the Three Gorges clearing work. The bridge's successfully blasting clears the final hurdle of Three Gorges Clearing. In the article, detailed blasting parameters and various situations are narrated which can provide a similar experience for the relative blasting projects.
出处 《重庆建筑》 2012年第2期21-25,共5页 Chongqing Architecture
关键词 拆除爆破 延期爆破 条形切割药包 涌浪控制 demolition blasting delay blasting strip cutting kits surge controlling.
  • 相关文献

参考文献4

二级参考文献20

  • 1公文新,蔡金贤,金信哲.二十六层楼房爆破拆除[J].爆破,2004,21(3):40-44. 被引量:13
  • 2李守巨.拆除爆破中的安全防护技术[J].工程爆破,1995,1(1):71-75. 被引量:78
  • 3亨利奇J.爆炸动力学及其应用[M].北京:科学出版社,1987..
  • 4夏常青 李玉岭.[D].长沙:长沙工程兵学院,1988.
  • 5车文彩.爆破技术[M].北京:军事谊文出版社,1991..
  • 6GUO Yue-liang, ZUO Yu-jun,WANG Di-an. Discussion on Collapse Vibration Caused by Demolition Blasting [A]. New Development on Engineering Blasting APS Blasting 1[M], 2007 Kunming China. Beijing:Metallurgical Industry Press,2007.
  • 7周家汉,陈善良,杨业敏,戴铭荣.爆破拆除建筑物时振动安全距离的确定[A]:工程爆破文集(第三辑)[C].北京:冶金工业出版社,1988,112-119.
  • 8周家汉,金保堂,陈善良.高烟囱拆除爆破及塌落振动测量与分析[A].工程爆破文集(第七辑)[C].乌鲁木齐:新疆青少年出版社,2001,707-712.
  • 9于亚伦.工程爆破理论与技术[M](全国工程爆破作业人员统一培训教材).北京:冶金工业出版社,2004,323-358.
  • 10曲广建,崔允武,吴岩,等.温州市93m结构不对称楼房拆除爆破[A].中国典型爆破工程与技术[M].北京:冶金工业出版社,2006.

共引文献235

同被引文献5

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部