详细介绍了越南某水泥粉磨站辊压机联合粉磨系统的调试情况,包括调试中出现的问题与处理措施,该粉磨系统已通过性能考核,达到了设计指标。初步探讨了辊压机联合粉磨系统的设计、安装、调试及操作要点;同时对系统除铁,辅机配选,入料旁路处理等问题进行了分析探讨。
Commissioning of the roller press combined cement grinding system in a Vietnam cement grinding plant was introduced in detail as well as the problems and measures. And the grinding system had passed performance examine and reached the designed indexes. And the points in design, assembly, commissioning and operation of the roller press combined grinding system were analysed as well as the iron removal system, auxiliaries and bypass system.
出处
《水泥工程》
CAS
2012年第1期47-50,共4页
Cement Engineering
关键词
辊压机
联合粉磨系统
调试
系统分析
Roller press
combined grinding system
commissioning
analysis of system