摘要
简要介绍了国外EPC工程项目的运输风险(包括外来风险和海上风险)识别。在此基础上,从运输条款、货物包装、租船订舱、货物装卸、海运订单和运输途中六个方面详细介绍了实际的国外EPC项目运输操作各个环节的风险评估和防范措施。
Transportation risk identification of international EPC project, including extraneous risk and marine risk, were introduced in brief. And based on that the risk assessment and precations in every step of real tranportation operation of international EPC project were introduced in detail from the six aspects of delivery clause, cargo package, chartering and booking shipping space, cargo handling, shipping order and in transit.
出处
《水泥工程》
CAS
2012年第1期86-88,共3页
Cement Engineering
关键词
EPC项目
运输
风险识别
外来风险
海上风险
EPC project
transportation
risk indentification
extraneous risk
marine risk