分析某在建高速公路某隧道施工过程,该工程在隧道出洞时发生穿越冲沟,引起已建隧道洞项山体开裂,对隧道安全运营造成巨大隐患。设计中对未施作隧道进行加固设计及对洞口附近小滑体进行整治,以确保隧道施工及运营安全。
This paper analyzes a tunnel of a highway under construction.Crossing gully has happened in the project when the tunnel was unkenneling which caused tunnel roof mountain mass′ cracking.It has a huge risk about the safety of the operation of tunnel.In order to ensure the safety of the construction and operation of the tunnel,the tunnel which has not been constructed is reinforced in design and the small slip mass near cave is treated.
出处
《交通标准化》
2012年第3期106-108,共3页
Communications Standardization
关键词
隧道
穿越
冲沟滑体
加固
tunnel
pass through
gully slip mass
reinforce