期刊文献+

Steel-Making and Continuous/Ingot Casting Scheduling of Mixed Charging Plan Based on Batch Splitting Policy 被引量:5

Steel-Making and Continuous/Ingot Casting Scheduling of Mixed Charging Plan Based on Batch Splitting Policy
原文传递
导出
摘要 For steel-making and continuous/ingot casting are the key processes of modern iron and steel enterprises, this paper proposes a batch splitting schedule policy to solve continuous and ingot casting schedule of mixed whole/ half charging plan for steel making. First establish the model of continuous and ingot casting schedule of mixed whole/half charging plan according to the complex constraints. Then solve this model by heuristic algorithm. Finally use actual data to prove the proposed algorithmrs validity and analyze the application result in steel plant. For steel-making and continuous/ingot casting are the key processes of modern iron and steel enterprises, this paper proposes a batch splitting schedule policy to solve continuous and ingot casting schedule of mixed whole/ half charging plan for steel making. First establish the model of continuous and ingot casting schedule of mixed whole/half charging plan according to the complex constraints. Then solve this model by heuristic algorithm. Finally use actual data to prove the proposed algorithmrs validity and analyze the application result in steel plant.
出处 《Journal of Iron and Steel Research(International)》 SCIE EI CAS CSCD 2012年第2期17-21,共5页 钢铁研究学报(英文版)
基金 Sponsored by National Basic Research Program of China (2009CB320601) National Natural Science Foundation of China (7102061,60974091,61020106003) Program for New Century Excellent Talents in University (NCET-08-0105)
关键词 continuous/ingot casiing whole/half charging batch splitting policy SCHEDULING continuous/ingot casiing whole/half charging batch splitting policy scheduling
  • 相关文献

参考文献9

  • 1Zanoni S, Zavanella L. Model and Analysis of Integrated Pro duction-Inventory System: The Case of Steel Production [J]. International Journal of Production Economics, 2005, 93-94 (8) : 197.
  • 2Ferretti I, Zanoni S, Zavanella L. Production-Inventory Scheduling Using Ant System Metaheuristic [J]. International Journal of Production Economics, 2006, 104(2): 317.
  • 3Kumar V, Kumar S, Tiwari MK. Auction-Based Approach to Resolve the Scheduling Problem in the Steel Making Process [J]. International Journal of Production Research, 2006, 44 (8) : 1503.
  • 4Tang L, Luh PB, Liu J, et al. Steel-Making Process Scheduling Using Lagrangian Relaxation [J]. International Journal of Production Research, 2002, 40(1) : 55.
  • 5Lee K, Chang SY, Hong Y. Continuous Slab Caster Scheduling and Interval Graphs[J]. Production Planning and Control, 2004, 15(5): 495.
  • 6Ouelhadj D, Cowling PI, Petrovic S. Utility and Stability Measures for Agent-Based Dynamic Scheduling of Steel Continuous Casting [D]. Nottingham: University of Nottingham 2003.
  • 7Stohl K, Spopek W. VAI-Schedex.. A Hybrid Expert System for Co-Operative Production Scheduling in Steel Plant [C] // International Conference on Computerized Production Control in Steel Plant, Korea.. Korean Institute of Metals and Materials,1993: 207.
  • 8Ferretti I, Zanoni S, Zavarella L. Production-Inventory Sched- uling Using Ant System Metaheuristic [J]. International Journal of Production Economic, 2006, 104(2): 317.
  • 9ZHU Dao-fei,ZHENG Zhong,GAO Xiao-qiang.Intelligent Optimization-Based Production Planning and Simulation Analysis for Steelmaking and Continuous Casting Process[J].Journal of Iron and Steel Research(International),2010,17(9):19-24. 被引量:14

二级参考文献10

  • 1郑忠,何腊梅,高小强.炼钢生产物流系统仿真的细胞自动机模型[J].钢铁,2004,39(11):75-78. 被引量:17
  • 2Tang L, Liu J, Rong A, et al. A Review of Planning and Scheduling Systems and Methods for Integrated Steel Production [J]. European Journal of Operational Research, 2001, 133(1): 1.
  • 3Atighehchian A, Bijari M, Tarkesh H. A Novel Hybrid Algorithm for Scheduling Steel-Making Continuous Casting Production [J]. Computers and Operations Research, 2009, 36(8): 2450.
  • 4Tang L, Liu J, Rong A, et al. A Mathematical Programming Model for Scheduling Steelmaking-Continuous Casting Production [J]. European Journal of Operational Research, 2000, 120 (2), 423.
  • 5Tang L, Luh P B, Liu J, et al. Steel-Making Process Scheduling Using Lagrangian Relaxation[J]. International Journal of Production Research, 2002, 40(1): 55.
  • 6Bellabdaoui A, Teghem J. A Mixed-integer Linear Programming Model for the Continuous Casting Planning [J]. International Journal of Production Economics, 2006, 104(2) : 260.
  • 7Ferretti I, Zanoni S, Zavanella L. Production-Inventory Scheduling Using Ant System Metaheuristic [J]. International Journal of Production Economics, 2006, 104(2) : 317.
  • 8Mohanty P P. An Agent-Oriented Approach to Resolve the Production Planning Complexities for a Modern Steel Manufacturing System [J]. Int J Adv Manuf Technol, 2004, 24(3-4): 199.
  • 9Tang L, Wang G. Decision Support System for the Batehing Problems of Steelmaking and Continuous-Casting Production [J]. Omega, 2008, 36(6): 976.
  • 10YANG Jing-ming CHE Hai-jun DOU Fu-ping ZHOU Tao.Genetic Algorithm-Based Optimization Used in Rolling Schedule[J].Journal of Iron and Steel Research(International),2008,15(2):18-22. 被引量:14

共引文献13

同被引文献43

  • 1王秀英,柴天佑,郑秉霖.炼钢-连铸智能调度软件的开发及应用[J].计算机集成制造系统,2006,12(8):1220-1226. 被引量:22
  • 2BEILABDAOUI A,TEGHEM J.A mixed-integer linear pro-gramming model for the continuous casting planning[J].Inter-national Journal of Production Economics,2006? 104(2):260-270.
  • 3PAN Quanke,WANG Ling,MAC)Kun,et al.An effective ar-tificial bee colony algorithm for a real-world hybrid flowshopproblem in steelmaking process[J].IEEE Transactions on au-tomation science and engineering,2013,10(2):307-322.
  • 4LI Jie,XIAO Xin,TANG Qiuhua,et al.Production schedu-ling of a large-scale steelmaking continuous casting process viaunit-sSpecific event-based continuous'-time models:short-termand medium-term scheduling[J].Industrial EngineeringChemistry Research,2012,51(21):7300-7319.
  • 5PACCIARELLI D,PRANZO M.Production scheduling in asteelmaking-continuous casting plant[J].Computers andChemical Engineering,2004,28(12):2823-2835.
  • 6ATIGHEHCHIAN A,BIJARI M,TARKESH H.A novel hy-brid algorithm for scheduling steel-making continuous castingproduction[J].Computers&Operations Research,2009,36(8):2450-2461.
  • 7PAN Quanke,FATIH TASGETIREN M,SUGANTHAN PN,et al.A discrete artificial bee colony algorithm for the lot-streaming flowshop scheduling problem[J].Information Sci-ences,2011,181(12):2455-2468.
  • 8KARABCXjA D.An idea based on honey bee swarm for nu-merical optimization[EB/OL].[2012-03-03],http://mf.er-ciyers.edu.tr/abc/pub/trob_2005.pdf.
  • 9KARABCXjA D,BASTURK B.A powerful and efficient al-gorithm for numerical function optimization:artificial bee col-ony(ABC)algorithm[J].Journal of Global Optimization,2007,39(3):459-471.
  • 10KARABCX,A D,AKAY R,OZTURK C.Artificial bee colony(ABC)optimization algorithm for training feed-forward neuralnetworks[J].Lecutre Notes in Computer Science,2007,4617:318-329.

引证文献5

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部