摘要
"十一五"期间,上海南汇地区先后建造了35kV南汇风电场、110kV东海大桥风电场和35kV临港新城风电场。通过对南汇地区3个风电场的建设回顾,比较了风电场的主接线形式和运行方式,分析了风电场的并网操作和低电压穿越等问题,并提出了有待改进的技术措施和相关建议。
Three different wind farms have been built in the "Eleven-five year" period at Nanhui Distract in Shanghai.They are 35 kV Nanhui wind farm,110 kV Donghai Bridge wind farm and 35 kV Lingang New City wind farm.Firstly,comparison the connection and operation modes of three wind farms has been made.Then the paper analyzes the operation of grid connection and LVRT.Finally,suggestion to optimize the technical measures of wind farm is proposed.
出处
《电力与能源》
2012年第1期65-67,71,共4页
Power & Energy
关键词
风电场
接线方式
运行方式
wind farm
connection mode
operation mode