摘要
通过比较220 kV春申站及其相关各受控站35 kV系统中性点接地方式,发现站内35 kV系统3只消弧线圈均处于欠补偿状态。在对欠补偿的危害进行具体分析的同时,提出2种解决方案,即增加消弧线圈的容量及改为采用经小电阻接地方式,通过对比分析提出了对春申站进行小电阻接地系统改造的建议,并分析了实施的可行性。
By comparing neutral grounding mode in 35 kV system of 220 kV Chunshen substation and its govered substations,the problem that three arc-suppression coils in 35 kV system of Chunshen Substation staying sub-compensation status is presented.Based on detailed analysis of sub-compensation,reasonable solutions are proposed,including increasing capacity of arc-suppression coil and adopting low resistance grounding.Then the paper makes suggestions on constructing low resistance grounding for Chunshen Substation,as well as feasibility of the implementation is analyzed.
出处
《华东电力》
北大核心
2012年第2期332-334,共3页
East China Electric Power