期刊文献+

带延迟修理的退化服务台排队系统更换模型研究

Research on Replacement Model for Queuing System with Deteriorative Repairable Service Station Including Delay Repair
下载PDF
导出
摘要 针对带有延迟修理的退化可修服务台的排队系统,提出了一种新的维修更换模型。假定服务台逐次故障后的维修时间构成随机递增的几何过程,工作时间构成随机递增的几何过程,在服务台每次故障以概率p需要延迟修理和延迟修理时间为随机变量的情况下,选取被服务的顾客数N为其更换策略,以系统长期运行单位时间内的期望效益为目标函数,通过更新过程和几何过程理论建立数学模型,导出了目标函数的解析表达式。并根据目标函数情况,通过最大化目标函数来获取系统最优的更换策略N*,最后还对结果进行了讨论。 To study queueing system with deteriorative repairable service station including delay repair, this paper proposes a kind of new maintenance and replacement model. Supposing that the successive survival time of the system constitute a decreasing geometric process stochastically, while the consecutive repair time of the system constitute an increasing geometric process, under the conditions that the delay repair time is random variable and the failure service station needs delay repair with probability , we take the number N of the customer that have been serv- iced at the service station as its replacement policy and choose the long - run expected profit per unit time as objec- tive function. By using renewal process and geometric process theory, mathematic model is established and the ex- plicit expressions of the objective function is derived. According objective function, the optimal replacement policy is obtained by maximizing the objective function. Finally, we discuss the result also.
出处 《河南机电高等专科学校学报》 CAS 2011年第5期1-4,共4页 Journal of Henan Mechanical and Electrical Engineering College
基金 EPSRC Grant EP/G039674/1
关键词 可修服务台 修理时间 排队系统 更换模型 延迟 退化 目标函数 几何过程 queueing system replacement model geometric process repairable service station delay repair ex-pected benefit
  • 相关文献

参考文献9

二级参考文献29

  • 1唐应辉.服务台可修的M/G/1/N排队系统分析[J].电子科技大学学报,1994,23(3):316-322. 被引量:3
  • 2刘志旺,唐应辉,刘晓云.M/G(M/H)/1可修排队系统的新结果[J].电子科技大学学报,1995,24(3):299-303. 被引量:2
  • 3贾积身,刘思峰,党耀国.基于ExSpect语言的维修过程建模与仿真[J].系统工程与电子技术,2006,28(1):143-145. 被引量:10
  • 4朱庆棠 陈良均.随机过程及时性应用[M].成都:电子科技大学出版社,1996.81-82.
  • 5Liu X G, Makis V, Jardine A K S. A replacement model with overhauls and repairs [J]. Naval Research Logistics, 1995,42 (7) :1063 - 1079.
  • 6Wang H, Pham H. A quasi renewal process and its applications in imperfect maintenance[J]. International Journal of Systems Science, 1996,27(10):1055-1062.
  • 7Lam Y. Geometric processes and replacement problem[J]. Acta. Mathematics Applicate Sinica, 1988, 4(4) : 366 - 377.
  • 8Stadje W, Zuckerman D. Optimal strategies for some repair replacement models [J]. Advances in Applied Probability, 1990,22(3):641 - 656.
  • 9Jia J S, Guo B N. Optimal replacement policy for queuing system with repairable service station that repairing is not "as good as new"[C]// Proc. of the Jangjeon Mathematical Society, 2003, 6(1):65 -70.
  • 10Jia J S, Wu S M. Optimizing replacement policy for a cold standby system with waiting repair times[J]. Applied Mathematics and Computation, 2009, 214(1) :133 - 141.

共引文献50

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部