摘要 广东粤电靖海发电有限公司烟气湿法脱硫装置中的烟气-烟气加热装置(GGH)在运行过程中经常发生堵塞。针对GGH堵塞的主要原因进行分析,提出了具体的改造方案,将原2层平板式除雾器改成2层屋脊式加1层管式除雾器,改造后运行效果良好,节能环保效益显著。 The GGH device in the FGD (Flue Gas Desulfurization) system of Guangdong Jinghai Power Plant is often found clogged during operation. Based on an analysis of the leading cause of the congestion, this paper puts forward a specific rectification proposal, namely turning the original two-layer flat-plate demister into a set of two roof-type layers plus one tubular layer. The rectification made according to the proposal has resulted in good operation effects with significant energy-saving benefits.
出处 《能源技术经济》 2011年第12期66-69,共4页 Electric Power Technologic Economics
关键词 火电机组 湿法烟气脱硫 除雾器 改造 thermal power generation unit FGD demister renovation
  • 相关文献

参考文献11

二级参考文献16

共引文献60

同被引文献9

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部