摘要 小湾水电站拱坝最大坝高294.5 m,共27层灌区,坝后仅设计5层永久马道,无法满足坝体混凝土通水冷却、横缝接缝灌浆及冷却水管回填等项目施工需求。为满足施工期间交通及坝体混凝土通水冷却等项目的使用要求,水电四局小湾工程项目部对坝后交通进行了研究,设计了可快速安、拆,周转使用的钢栈桥和转梯,满足了坝后临时交通需求,保障了各项施工项目顺利完成。 The arch dam of Xiaowan Hydropower Station is 294.5m high at maximum and with 27-layer grouting areas.But 5-layer permanent berms only are designed behind the dam.This cannot satisfy construction requirements on dam body concrete cooling with water,transverse joint grouting and cooling-water-pipe backfilling,etc.To meet application requirements of accesses and dam body concrete cooling with water during construction period,Xiaowan Project Management of Sinohydro Engineering Bureau 4 Co.,Ltd.studied the dam-behind accesses and designed steel trestles and spiral ladders which can be installed and dismantled quickly as well as utilized repeatedly.They satisfied requirement on temporary access behind the dam and assured smooth completion of construction activities.
出处 《西北水电》 2012年第1期34-37,共4页 Northwest Hydropower
关键词 坝后交通 规划设计 钢栈桥 转梯 小湾水电站 Accesses behind dam planning and design steel trestle spiral ladder Xiaowan Hydropower Station
  • 相关文献

参考文献2

  • 1GB50017-2003.钢结构设计规范[S].[S].,..
  • 2JGJl30-2001,建筑施工扣件式钢管脚手架安全技术规范[S].

共引文献2077

同被引文献19

引证文献5

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部