期刊文献+

锦屏水电站枯期运行方式浅析

Superficial Analysis on Operating Mode in Low Water Period of Jinping Hydropower Station
下载PDF
导出
摘要 通过分析锦屏1、2级电站首尾相接的特点,初步探讨了枯水期两级电站经济运行的有功优化可行方式,为电站投产后的实际安全经济运行提供了参考。 The feasible mode for active power optimization of the economic operation between the two-stage hydropower stations in low water period are discussed through the analysis on the features of Jinping Power Plant in which the first stage station and the second stage station are connected end to end.It provides a useful reference for the safe and economic operation after the hydropower stations being put into service.
出处 《四川电力技术》 2012年第1期54-56,共3页 Sichuan Electric Power Technology
关键词 枯水期 经济运行 有功优化 low water period economic operation active power optimization
  • 相关文献

参考文献1

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部