摘要
500 kV变电站的预防试验工作往往是工作量大、耗时间长,容易造成工作人员精神不集中,另外站内较强的感应电会影响工作进度、试验数据,甚至损坏试验仪器或让试验人员承受电击之痛。所以在保证预防试验全面准确的前提下,通过提高工作效率来降低工作量及减少工作时间就成为急需探讨的问题。就500 kV变电站一次设备预防试验工作中一些提高效率的可行方法作了介绍。
The preventive test of 500 kV substation is always a long time of hard work,so the working staff can hardly concentrate their attention on work,and the induced voltage will affect the working schedule and test data,even damage the instruments or let the staff get an electric shock.So,how to improve the working efficiency and reduce the work load and working time is an important and instant problem.Some useful methods that will improve the working efficiency in the preventive test of primary equipment in 500 kV substations are introduced.
出处
《四川电力技术》
2012年第1期80-82,共3页
Sichuan Electric Power Technology
关键词
预防试验
提高效率
方法
preventive test
efficiency improvement
method