摘要 随着全球深水油气资源的开发,J型铺管法已经成为深水和超深水海底管道铺设的重要方式。针对目标母船提出两种J型铺管塔的概念设计方案,并进行了铺管效率及经济性的对比分析,进一步对J型铺管关键设备进行了结构设计及安全性分析。此项工作对促进我国J型铺设系统的开发有积极地推动作用。 With the exploitation of oil and gas resources in deepwater, J-lay method has been the main way used in deepwater and ul- tra-deepwater. However, the key j-lay pipe laying technology and equipments were in the past monopolized by several foreign companies. This paper introduces two designs of J-lay tower for an S-lay vessel, and efficiency and cost are comparatively analyzed. The structure of the main parts of J-lay tower is designed and safety assessment is done. The research plays an important role in the development of J-lay system in China.
出处 《海洋工程》 CSCD 北大核心 2012年第1期126-130,共5页 The Ocean Engineering
基金 国家科技重大专项经费资助项目(2008ZX05026-005-1 2008ZX05027-002-07) 国家高技术研究发展专项经费资助项目(2008AA09A105-0)
关键词 海底管道 铺管塔 结构设计 安全性分析 pipelines J-lay tower structure design safety assessment
  • 相关文献

参考文献6

  • 1E P Heerema. Recent achievements and present trends in deepwater pipe-lay systems[ C ]//OTC. 2005,17627:1-2.
  • 2黄维平,曹静,张恩勇.国外深水铺管方法与铺管船研究现状及发展趋势[J].海洋工程,2011,29(1):135-142. 被引量:56
  • 3Boyun Guo, Shanghong Song. Offshore Pipelines[ M ]. Gulf Professional Publishing,2005 : 129-135.
  • 4Robert Faldini. $7000 : A new horizon[ C]//OTC. 1999,10712 : 1-2.
  • 5Dick Wolbers, Rob Hovinga. Installation of deepwater pipelines with sled pssemblies using the new J-Lay system of the DCV bal- der[ C ]//OTC. 2003,15336 : 1-3.
  • 6Linacre House, Jordan Hill. Mechanics of Offshore Pipelines [ M ]. Elsevier Science,2007.

二级参考文献14

  • 1William L Leffler, Richard Pattarozzi, Gordon Sterling. Deepwater Petroleum Exploration & Production[R]. USA, PennWell Corporation, 2003.
  • 2Yong Bai, Qiang Bai. Subsea Pipelines and Risers[R]. Great Britain, Elsevier Ltd, 2005.
  • 3Ben C Gerwick Jr. Construction of Marine and Offshore Structures[M]. USA, CRC Press, 2007.
  • 4sChristopher West, Stephen Armstrong, Damon MeMillan, et al. S-lay installation of riser fairings for the independence hub[C]//Proceedings of the International Conference on Offshore Mech~ics and Arctic Engineering. 2007(1):515-525.
  • 5Heedo D Yun, Ralf R Peek, Paul R Paslay, et al. Loading history effects for deep-water S-lay of pipelines[J]. Journal of Offshotve Mechanics and Arctic Engineering, 2004, 126(2): 156-163.
  • 6Massimo Pulici, Marian Trifon, Andrei Dumitrescu. Deep water salines installation by using the J-lay method-The blue stream experience[ C] //Proceedings of the International Offshore and Polar Engineering Conference, ISOPE. 2003:585-590.
  • 7Dick Wolbers, Rob Hovinga. Installation of deepwater pipelines with sled assemblies using the new J-lay system of the DCV balder[J]. Journal of Offshore Technology, 2003, 11 (3) : 46-57.
  • 8T A Netto, A Botto, M I Lourenco, et all. On the feasibility of installing SCR's by the reel-lay method[ C ]//' Proceedings of the 12th In- ternational Congress of the International Maritime Association of the Mediterranean. 2005(2):1447-1454.
  • 9Alastair Tawns. Reel-laying of rigid pipelines[J]. Materials Performance, 2004, 43( 10): 24-26.
  • 10llson P Pasqualino, Segen F Estefen, Silvia L Suva. The effect of the reeling laying method on the collapse pressure of steel pipes for deepwater[C]//Proceedings of the International Conference on Offshore Mechanics and Arctic Engineering, ASME. 2004(3):247- 254.

共引文献55

同被引文献45

  • 1陈子平.浅谈控制系统冗余控制的实现[J].自动化仪表,2005,26(9):4-6. 被引量:59
  • 2陈晓波,林勇刚,李伟.基于Bladed的电液比例变桨距风力机半物理仿真平台[J].机床与液压,2006,34(12):116-118. 被引量:5
  • 3金之钧,蔡立国.中国海相油气勘探前景、主要问题与对策[J].石油与天然气地质,2006,27(6):722-730. 被引量:91
  • 4包建华,丁启胜,张兴奎.工控组态软件MCGS及其应用[J].工矿自动化,2007,33(3):92-94. 被引量:51
  • 5BAI Y,BAI Q.Subsea pipelines and risers[R].Great Britain:Elsevier Ltd.,2005.
  • 6GERWICK B C.Construction of marine and offshore Structures[M].USA:CRC Press,2007.
  • 7WEST C,ARMSTRONG S,MCMILLAN D,et al.S-lay installa tion of riser fairings for the independence hub[C]//Proceedings of the International Conference on Offshore Mechanics and Arctic Engineering,2007 (1):515-525.
  • 8WOLBERS D,HOVINGA R.Installation of deepwater pipe lines with sled assemblies using the new J Lay system of the DCV Balder[C].OTC 15336,2003.
  • 9PULICI M,TRIFON M,DUMITRESCU A.Deep water sea lines installation by using the J lay method:The blue stream experience[C]// Proceedings of the International Offshore and Polar Engineering Conference,ISOPE,2003:585-590.
  • 10CAVICCHI M,ARDAVANIS K.J-Iay installations lessons learned[C].OTC 15333,2003.