期刊文献+

红沙泉一号露天煤矿首采区及拉沟位置方案优化 被引量:13

Optimization for the first mining area and pioneer cut position scheme in Hongshaguan NO.1 cpencast coal mine
下载PDF
导出
摘要 在分析了红沙泉一号露天煤矿的地质条件及煤层赋存情况等基础上,确定了首采区的大致位置,在首采区内提出了3种拉沟位置方案,并进行了优化分析,确定了合理的首采区及初始拉沟位置,研究结果对红沙泉一号露天煤矿首采区及拉沟位置方案的选择具有一定的参考价值,文中的研究思路值得其他同类型露天矿借鉴和参考。 Based on the analysis on the geological conditions and coal seam conditions of the opencast, this paper pointed out the approximate location of the first mining .area. Meanwhile, the paper provided 3 options of pioneer cut position in the approximate first mining area. It determined a reasonable first mining area and the location of the pioneer cut position after optimization. The results of this study had some reference value for the design of first mining area and pioneer cut position of Hongshaquan opencast, while the research ideas of this paper can be referenced for the other same type of open pit mine.
出处 《露天采矿技术》 CAS 2012年第1期1-4,9,共5页 Opencast Mining Technology
关键词 首采区 拉沟位置 露天矿 红沙泉 优化设计 first mining area pioneer cut position openeast Hongshaquan optimization design
  • 相关文献

参考文献1

  • 1GB50197-2005.煤矿工业露天矿设计规范[S].

共引文献8

同被引文献75

引证文献13

二级引证文献49

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部