文章以浙江省某医院门诊大楼深基坑工程为例,介绍了在周边环境复杂的情况下,采用全逆作法施工可提高开挖工作效率、减少基坑变形及降低施工成本,并提出确保深基坑施工顺利实施的关键技术。
Based on the case of the deep foundation pit construction of a provincial hospital outpatient building in Zhejiang, this paper introduces the fully reverse constrtiction method that can enhance excavation working efficiency, prevent pit deformation and reduce the cosls under complex surroundings, providing key technique for smooth pit construction.
出处
《企业科技与发展》
2012年第3期49-51,共3页
Sci-Tech & Development of Enterprise
关键词
深基坑
全逆作法
关键技术
deep foundation pit
the fully reverse construction method
key technique