期刊文献+

摊铺等待时间对环氧沥青混合料性能的影响 被引量:5

Impact of Paving Waiting Time on Performance of Epoxy Asphalt Mixture
下载PDF
导出
摘要 通过大量室内试验,以高温、疲劳和抗水损害性能作为主要检测项目,分别从3个方面评价环氧沥青混合料摊铺等待时间对其性能的影响,并通过灰关联分析法给出了环氧沥青混合料的最佳摊铺等待时间推荐值.结果表明:当摊铺等待时间小于30min时,环氧沥青混合料性能无变化;当灰关联综合性能下降至80%时,其摊铺等待时间最长,可达80min.这种方法可用于环氧沥青的研发和工程实践的评判. A large number of laboratory tests were carried out, which took high temperature, fatigue and moisture resistance as main test items. The research not only evaluated the impact of waiting time for pav- ing on the performance of epoxy asphalt from three aspects, but also integrated these items and put for- ward suggestions on the value of waiting time for paving by the grey relationship analysis methods. The results indicate that if the waiting time for paving is less than 30 min, the performance of epoxy asphalt will remain unchanged~ however, when the grey connection performance declines to 80%, it will take the longest waiting time for paving, which can be as long as 80 rain. This method can be applied to the resear- ches and developments of epoxy asphalt as well as the evaluation of engineering practice.
作者 黄明 黄卫东
出处 《建筑材料学报》 EI CAS CSCD 北大核心 2012年第1期122-125,共4页 Journal of Building Materials
基金 国家自然科学基金资助项目(50308021)
关键词 环氧沥青混合料 摊铺等待时间 性能检测 灰关联 epoxy asphalt mixture paving waiting time performance evaluation grey system
  • 相关文献

参考文献3

二级参考文献9

  • 1李洪涛,黄卫.润扬大桥钢桥面铺装实桥试验研究[J].公路交通科技,2005,22(4):76-78. 被引量:18
  • 2闵召辉,黄卫.环氧沥青的粘度与施工性能研究[J].公路交通科技,2006,23(8):5-8. 被引量:46
  • 3钟建驰,李洪涛,冯兆祥.润扬大桥钢桥面铺装工程实施与质量管理简介[J].世界桥梁,2007,35(2):68-71. 被引量:7
  • 4Manfred E, Siegfried S. Reliability of pavement on steel bridegs with orthotropic plates [J]. Berichte der Bulxlesanstalt fur Strαβenwesen, 2000.
  • 5J B Sousa, Craus, L Monismith. Summary Report on Permanent Deformation in Asphalt Concrete. Report SHRP-A/-IR-91-104 [R]. Static Highway Research Program, 1991.
  • 6Bild S. Contribution to the Improvement of the Durability of Asphalt Pavement on Orthotropic Steel Bridge Decks. Achen: RWTH Achen, 1985
  • 7Kennedy T W. Practical use of the indirect tensile test for the characterization of pavement materials. Proc 9th ARRB Con- ference, Brisbane, 1978, 9(3): 36~45
  • 8Walter J L, Hicks R, Wilson J E. Impact of variations in material properties on asphalt pavement life-evaluation of warren- scappoose project. Report No FHWA-OR-81-7. Oregon: Oregon State University, 1981. 62~72
  • 9HUANG Wei, QIAN Zhendong, CHEN Gang & YANG Jun Transportation College, Southeast University, Nanjing 210096, China Correspondence should be addressed to Huang Wei (e-mail: hwei@ seu.edu.cn).Epoxy asphalt concrete paving on the deck of long-span steel bridges[J].Chinese Science Bulletin,2003,48(21):2391-2394. 被引量:50

共引文献182

同被引文献27

  • 1魏奇芬,张晓春,王森.大跨径钢桥桥面沥青铺装设计之比较[J].江苏交通,2003(11):49-51. 被引量:9
  • 2黄卫,刘振清.大跨径钢桥面铺装设计理论与方法研究[J].土木工程学报,2005,38(1):51-59. 被引量:100
  • 3李宇峙,吴国平,邵腊庚.环氧沥青混凝土材料在钢桥面铺装中的应用[J].中南公路工程,2005,30(3):168-170. 被引量:27
  • 4闵召辉,黄卫.环氧沥青的粘度与施工性能研究[J].公路交通科技,2006,23(8):5-8. 被引量:46
  • 5黄明.考虑多因素的沥青混合料疲劳性能评价与对比[D].上海:同济大学,2013.
  • 6METCALF C T.Flexural of paving materials for orthotropics seel plate bridge [J].Highwag Research Record,1967:54-60.
  • 7FONDRIEST F F,SNYDER M J.Addendum report paving practices for wearing surfaces on wearing surfaces on orthotropic steel bridge decks [J].Am-Iron Steel Inst.:Steel Research and Construction Bulletin,1971,10(20):20-26.
  • 8WANG Haifang.Fatigue Performance Evaluation of WesTrack Asphalt Mixtures Based on Viscoelastic Analysis of Indirect Tensile Test [D].Raleigh:North Carolina State University,2002:12-23.
  • 9GHUZLAN K A.Fatigue Damage Analysis in Asphalt Concrete Mixtures Based Upon Dissipated Energy Concepts [D].Urbana-Champaign,US:University of Illinois at Urbana-Champaign,2001:22-25.
  • 10READ J,WHITEOAK D.The Shell Bitumen Handbook [M].London:Thomas Telford,Ltd,2003:78-112.

引证文献5

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部