摘要
以富川龙头风电场一期工程为研究对象,在对富川县进行电力需求预测及电力平衡的基础上,分析了龙头风电场的送电方向,提出了龙头风电场接入电网的两个方案。经技术和经济比较,得出龙头风电场接入系统方案。
Taking the phase-I project of Fuchuan Longtou wind power field as the research object,the paper analyzes the transmission direction and puts forward two connection schemes for Longtou wind power field based on the electric power demand forecasting and electric power balance of Fuchuan county.Finally,the better scheme is selected through technical and economical comparisons.
出处
《红水河》
2012年第1期42-43,62,共3页
Hongshui River
关键词
风电场
电力系统
接入
方案
wind power field
power system
connection
scheme