2Terasaki T.Predictive Equation for Cooling Time t8/5 of CTS Test Welds[J].Transactions of the Japan Welding Society, 1990,21(2):51-55.
3Terasaki. Cooling Time and Predictive Equation for Estimating Hydrogen Diffusion in CTS Test Welds[J].Transactions of the Japan Welding Society, 1991,22(1): 52-56.
4冯耀荣.西气东输管道及钢管相关技术研究[J].焊管,2003,26(3):194-208.
5Feng Yaorong, Huo Chunyong, Ma Qiurong, etc. Some Aspects on West-East Gas Transmission Pipeline Steels and Pipes, International Pipeline Conference (IPC02),Calgary, Canada, 2002, 9.