郑州会展宾馆塔吊拆除施工技术 被引量:7

The Construction Technology on the Demolition of Tower Crane in Zhengzhou Convention Hotel
下载PDF
导出
摘要 郑州会展宾馆主楼高度高,结构复杂,采用两台大型塔吊进行安装。利用屋面吊拆除塔吊,并在施工前综合设计屋面吊的安装位置、型钢梁承载能力分析、各台塔吊的先后拆除顺序,最终确定塔吊安全拆除。重点介绍塔吊拆除的设计思路、安装屋面吊及拆除时的关键技术。 Zhengzhou convention hotel building is height and tits structure is complex, with two large tower crane for installation. The roof hanging dismantling tower crane, and prior to the construction of integrated design and installation position of roof hangs, beam bearing capacity analysis of tower crane, the demolition order, ultimately determine the safety of tower crane demolition. It very emphasis on design thought, the demolition of tower crane and dismantled installed roof of the key technology.
作者 单毅 陆建飞
出处 《工程质量》 2012年第2期26-28,共3页 Construction Quality
关键词 屋面吊 塔吊拆除 施工技术 roof crane crane demolition construction technology
  • 相关文献

参考文献2

  • 1中华人民共和国国家标准.塔式起重机设计规范(GB/T13752-92)[S】.
  • 2中华人民共和国国家标准.塔式起重机安全规程(GB5114-2006)[s】.

同被引文献23

引证文献7

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部