摘要
通过对贵州省黎洛高速黎平互通立交区内桥涵设置、改移方案的优化调整,为互通立交详细设计方案的确定提供了新的思路,强调了各方面进行多方案比选的重要性,进而可以大幅降低工程造价。
Through optimization adjustment of bridge and culvert setting and reconstruction scheme of Liping Interchange section of Liluo Expressway of Guizhou,new ideas are provided for determination of detailed design scheme of interchange,importance of many schemes comparison and selection on many aspects are emphasized so as to greatly reduce the engineering cost.
出处
《北方交通》
2012年第2期50-52,共3页
Northern Communications
关键词
互通立交
桥涵设置
改移方案
方案比选
Interchange
Bridge and culvert setting
Reconstruction scheme
Scheme comparison and selection