期刊文献+

枢纽容量分配下的空铁联运网络设计 被引量:7

Air-Rail Network Design Based on Hub Capacity Allocation
下载PDF
导出
摘要 针对枢纽机场运营能力短缺问题,提出了空铁联运网络设计对其国内容量进行重新分配。从机场的角度,以最大化旅客盈余为目标,利用遗传算法设计出不同枢纽容量分配及联运高铁线路长度约束下的最佳网络拓扑结构。实例分析表明,与现有高铁线路长度的60%进行联运可释放100万人.次的国内容量,且能达到目前的营运能力,证明以高铁替代或补充现有的支线航班对于释放枢纽机场国内容量是可行的。 In this paper, an air and railway inter-modal network based on hub capacity relocation is designed to solve the problem of hub airport capacity shortage. From the perspective of the airport, the best network topological structure could be obtained by genetic algorithm with the objective of maximizing passenger surplus under the constraint of different combinations of hub capacity allocation and high-speed rail line length. According to the analysis, by using 60% of the ex- isting high-speed rail system capacity, as much as one million passenger trips can be accommodated to alleviate the current capacity shortage problem, thus proving the feasibility of using high-speed rail as substitution or complement to handle the feeder flights in support of the domestic capacity at hub airports.
作者 杨年 朱金福
出处 《交通信息与安全》 2012年第1期134-138,共5页 Journal of Transport Information and Safety
基金 国家自然科学基金资助项目(批准号:70771046) 江苏省博士后科研资助项目(批准号:0802041C)资助
关键词 空铁联运 枢纽容量分配 遗传算法 旅客盈余 air-rail inter-modal hub capacity allocation genetic algorithm passenger surplus
  • 相关文献

参考文献11

  • 1Janie M. High-speed rail and air passenger trans- port., a comparison of the operational environmental performance [J]. Proceedings of the Institution of Mechanical Engineers, Part F, Journal of Rail and Rapid Transit, 2003,217(4):259-269.
  • 2May M, Hill S B. Questioning airport expansion: A case study of Canberra International Airport [J]. Journal of Transport Geography, 2006,14 (6) :437 -450.
  • 3Givoni M, Banister D. Airline and railway integra- tion [J]. Transport Policy, 2006,13(5) :386-397.
  • 4Siggerud K, Spisak T. Intermodal transportation- potential strategies would redefine federal role in developing airport intermodal capabilities[M]. Dar- ty, U. S:Diane Publishing,2005.
  • 5Givoni M, Banister D. Airline and railway integra- tion [J]. Transport Policy, 2006,13 (5):386-397.
  • 6Adler N, Pels E, Nash C. High-speed rail and air transport competition: Game engineering as tool for cost-benefit analysis [ J ]. Transport Research, 2010,44(7) :812-833.
  • 7Stakie D. Allocating airport operation capacity: a role for the market? [J]. Journal of Air Transport Management, 1998(4) :111-116.
  • 8Abeyrantne R I R. Management of airport cinges- tion through slot allocation [ J]. Journal of Air Transport Management, 2000(6) :29-41.
  • 9Madas M A, Zografos K G. Airport slot allocation:From instruments to strategies [J]. Journal of Air Transport Management, 2006,12(2) :53-62.
  • 10Hazemoto J, Tsukai M, Okumura M. Evaluation of rail/air network considering alternative paths [J]. Infrastructure Planning Review, 2003, 20 (1) :255-260.

共引文献8

同被引文献98

引证文献7

二级引证文献65

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部