摘要
以武钢自备电厂输煤系统地下煤斗间工程为例,介绍大型沉井的设计和采用砖砌底模无垫木制作,干法下沉的施工技术及质量通病预防措施。
The design of large caisson and its constrUction techniques nes of birch bottom form construchon without stow-wood and sinking method without water as well as the prevention ofquality problems are introduced based on the construction of the underpoud coal scuttlehouse in the coal beltline of the power plant of Wuhan Steel Wosrks.
出处
《建筑技术开发》
2000年第1期23-25,共3页
Building Technology Development
关键词
地下煤斗间
大型沉井
设计
施工
沉井
Undergmund coal scuttle house
barge caisson
Design
Construction
Prevention
measures