摘要
本文介绍了系统工程中的层次分析法(AHP),并以该队承包的山东省乳山金矿改扩建工程送料钻孔施工方案选择为例,说明了其具体应用。
This article introduces AHP, a method used in systems engineering, with case study of Rushan Gold Mine in Shandong, where the technique was applied for choosing of drilling projects in the reconstruction and expansion of the mine.