糯扎渡水电站大型地下洞室群施工安全监理 被引量:1

Safety supervision on construction of underground cavern group of Nuozhadu Hydropower Station
下载PDF
导出
摘要 糯扎渡水电站地下工程洞室多,断面尺寸大,围岩条件差,施工工期紧,施工难度大,对施工安全影响较大。为了保证施工安全,监理机构建立了完整的施工安全管理体系,包括"一岗双责"制度、施工安全管理技能研讨制度、危险源辨识和施工安全管控重点项目台帐制度等。施工过程中,监理部门切实落实了施工安全管理措施,确保了工程施工安全顺利完成。 The underground cavern of Nuozhadu Hydropower Station is characterized by large number of caverns, large cross - section size, tight construction period, difficult construction and these factors have large influences on the construction safety. The supervision department established an integral safety management system, including " one post responsible two aspects" , dis- cussion on safety management skills, identification of dangerous sources and statistical work for key items, so as to ensure the construction safety. In the construction, the supervision department implemented the construction safety management system seri- ously and guaranteed a smooth and safe construction.
出处 《人民长江》 北大核心 2012年第4期19-21,共3页 Yangtze River
关键词 大型地下洞室群 施工安全管理 管理措施 糯扎渡水电站 large - scale underground cavern group construction safety management management measures Nuozhadu Hy- dropower Station
  • 相关文献

同被引文献7

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部