糯扎渡水电站水头高,电站压力钢管管壁厚、单节管节重、制作与安装要求高,且压力钢管在工地现场卷制。为了保证压力钢管的制造安装质量,在分析钢管质量要求及制造、安装工艺的基础上,监理机构制定了祥细的质量监控方案,对高强度厚板钢焊接、瓦片卷制、钢管现场安装等关键工序进行了全过程监控,保证了钢管制造、安装质量满足设计和规范要求。
Nuozhadu Hydropower Station is characterized by high water head, thick penstock, large single - penstock weight, high requirement for penstock fabrication and installation, and the penstock is rolled and made in the construction site. In order to guarantee the fabrication and installation quality of penstock, by analyzing its quality requirement and fabrication and installa- tion technique, the supervision department made a detailed quality supervision scheme and carried out an overall supervision on high - intensity thick steel plate welding, bearing bush making, in - site installation, so as to ensure the quality of penstock fab- rication and installation meet the design and code requirements.
出处
《人民长江》
北大核心
2012年第4期64-66,91,共4页
Yangtze River
关键词
压力钢管
制造安装
质量监控
糯扎渡水电站
penstock
fabrication and installation
quality control and supervision
Nuozhadu Hydropower Station