摘要
针对工程造价管理在施工阶段出现的各种问题进行了分析,并结合在工作中的实际经验,探讨了加强设计变更、现场签证管理能有效地控制工程造价,对电力工程建设健康发展起到至关重要的作用。
The article analyses each kind of problems in project cost management during the construction phase.Combining with the practical experience in the job,it discusses the strengthening the change of design and the signing the verification at site,to effectively control the project cost,which plays a crucial role to the healthy development of electric power engineering construction.
出处
《湖北电力》
2012年第1期57-58,共2页
Hubei Electric Power
关键词
工程造价
施工
电力工程
project cost
construction
electricity engineering