摘要 针对现有研究采用集中决策的局限,研究了分散决策情形下经济批量与运送排产问题的最优决策。分析表明在无协调机制作用时,分散决策无法实现供应链系统的最优绩效,进一步提出一种利润共享和成本分担协议(PCS),并证明在PCS协议作用下,采用分散决策可以实现供应链协调,同时供应链利润可以在供需双方任意分配,具有很好的柔性。 Economic lot and delivery scheduling problem (ELDSP) is a typical research topic in the field of supply chain. Up to now, most research results obtained on this topic are based on centralized decision making. However, because of the autonomous nature of supply chain, it may not be always applicable.Thus, the ELDSP is studied by using decentralized decision making in this paper. A mathematical model is developed for this problem. Based on the model, it shows that an optimal solution cannot be obtained without coordination. Thus, the profit and cost sharing contract (PCS) is adopted for coordination. With PCS,the profit of the supply chain can be flexibly distributed between the vendor and buyer. In this way, an optimal solution for the ELDSP can be found if the profit and cost sharing contract is properly designed.
作者 李政道 周泓
出处 《工业工程》 北大核心 2012年第1期18-22,共5页 Industrial Engineering Journal
基金 国家自然科学基金资助项目(70771003,71071008,70821061)
关键词 经济批量与运送排产(ELDS) 协调机制 分散决策 供应链管理 economic lot and delivery scheduling (ELDS) coordination mechanism decentralized decision supply chain
  • 相关文献

参考文献3

二级参考文献23

  • 1熊中楷,里奇曼.经济批量问题中上界常数的存在性定理和算法[J].重庆大学学报(自然科学版),1996,19(4):60-65. 被引量:4
  • 2Bomberger E. A dynamic programming approach to a lot size scheduling problem[ J]. Management Science, 1966, 12 (11 ) : 778-784.
  • 3Doll C L, Whybark, D C. An iterative procedure for the single-machine multi-product lot scheduling problem[J]. Management Science, 1973, 20 ( 1 ) : 50-55.
  • 4Elmaghraby S E. The economic lot scheduling problem (ELSP) : Review and extensions[ J]. Management Science, 1978, 24 (6) : 587-598.
  • 5Taha H A, Skeith R W. The economic lot sizes in multi-stage production systems[J]. AIIE Transactions, 1970, 2(2) : 157-162.
  • 6Jensen P A, Khan H A. Scheduling in a multistage production system with set-up and inventory costs[J]. AIIE Transactions, 1972, 4(2) : 126-133.
  • 7Szendrovits A Z. Manufacturing cycle time determination for a multi-stage economic production quantity model[ J]. Management Science, 1975, 22(3) : 298-07.
  • 8El-Najdawi M K, Kleindorfer P R. Common cycle lot-size scheduling for multi-product, multi-stage production[ J]. Management Science, 1993, 39(7) : 872-885.
  • 9Ouenniche J, Boctor F F. Sequencing, lot sizing and scheduling of several products in job shop: the common cycle approach [J]. International Journal of Production Research, 1998, 36(4) : 1125-1140.
  • 10Ouenniche J, Boctor F F, Martel A. The impact of sequencing decisions on multi-item lot sizing and scheduling in flow shops [ J]. International Journal of Production Research, 1999, 37(10) : 2253-2270.

共引文献10

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部