摘要
对露天矿合理生产能力确定方法进行了分析比较,介绍了静态法、动态法生产能力确定方法,运用系统工程理论和方法,开发了我国露天矿生产能力分析软件。
An analytical comparison is made between the methods for determining the rational production capacity of open pit mines and both static and dynamic methods are presented.System engineering theory and method are used to develop a software for analyzing the production capacity of China's open pit mines.
出处
《金属矿山》
CAS
北大核心
2000年第2期16-18,共3页
Metal Mine