摘要
首次导出了备件在定期补充方式下的备件供应体制为两站制和三站制的备件延误时间模型,由此可用现场更换模块(LRU)的可靠性、维修性、备件保障性(RMS)参数来表达可靠性串联结构的系统战备完好率模型,从而可以对任务成功率、能执行任务率和使用可用度进行具体的工程设计。
The supply delay model of spare parts in regular supplying mode with two or three supplying stations is developed for the first time.Based on the model,the system readiness model of a reliability series structure can be expressed with the Reliability,Maintainability and Spares(RMS) supportability of the LRUs,enabling the design for mission success rate,mission capable rate and operational availability in the engineering.
出处
《电子产品可靠性与环境试验》
2012年第1期1-5,共5页
Electronic Product Reliability and Environmental Testing