摘要 针对表孔采用宽尾墩深孔采用窄缝坎新型消能形式,利用物理模型试验研究表深孔联合泄洪形成的分层多股射流在不同流量比情况下对水垫塘底板的动水冲击压强特性的影响。建立了表深孔流量比对水垫塘底板的动水冲击压强变化的关系,实验证实了上游水股产生的水垫对下游水股冲击压强确实具有减小的作用,水垫塘内流态稳定,消能充分,深孔射流产生的最大冲击压强随着表深孔射流流量比的逐渐增大而减小。该研究可为实际工程中合理确定分层多股射流流量比提供参考依据,为峡谷区高坝工程的坝身泄洪消能布置及水垫塘的抗冲防护和结构稳定性分析提供有力科学依据。 A physical model of new energy dissipator of high arch dams was tested to study the impinging pressure on the floor of a plunge pool.The dissipator of flood releasing is a combination of flaring piers on the spillway outlet and flip bucket in the deep outlet.Correlation was obtained between the discharge ratio of the top outlet over the deep outlet and the impinging pressure.The test verifies that the water cushion formed by the upstream spillway jet reduces the hydrodynamic pressure induced by the deep outlet jet.The peak pressure decreases with the increase of discharge ratio.The results are helpful to dissipator design of high arch dams.
出处 《水力发电学报》 EI CSCD 北大核心 2012年第1期114-117,共4页 Journal of Hydroelectric Engineering
基金 自然科学基金重点项目(50539060) 国家优秀博士论文基金资助项目(200043)
关键词 水力学 高拱坝 水垫塘 分层多股射流 物理模型试验 hydraulics high arch dams plunge pool multi-layer jets physical model experiment
  • 相关文献

参考文献7

二级参考文献25

  • 1刘沛清.矩形明渠水跃段速度分布的理论分析[J].水利学报,1993,25(9):48-54. 被引量:10
  • 2许唯临,廖华胜,杨永全,吴持恭.水垫塘三维紊流数值模拟及消能分析[J].水动力学研究与进展(A辑),1996,11(5):561-569. 被引量:31
  • 3-.小湾水电站增大坝身泄量减少一条泄洪洞方案的泄洪消能研究(坝身泄量分配研究)[M].北京:中国水利水电科学研究院水力学所,1998..
  • 4-.小湾水电站泄洪消能试验研究[M].北京:中国水利水电科学研究院水力学所,1995..
  • 5-.小湾水电站泄洪消能布置优化方案研究[M].北京:中国水利水电科学研究院水力学所,1999..
  • 6成都勘测设计院.高混凝土坝泄洪和消能的研究[R].成都:成都勘测设计院,1999.
  • 7昆明勘测设计院.高水头大流量泄洪消能研究[R].昆明:昆明勘测设计院,1995.
  • 8李福田.宽尾墩技术在高拱坝消能中的应用[D].北京:北京航空航天大学,2004.
  • 9许唯临,Proc 2nd Int Conf on Hydro-Science and Engineering,1995年,317页
  • 10陈永全,水利学报,1993年,4期,48页

共引文献112

同被引文献96

引证文献7

二级引证文献67

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部