摘要
主要介绍了高层超高层钢结构安装过程的各项控制措施,包括总平面规划、塔式起重机的选择、测量工艺、钢框架吊装顺序、安装工艺流程、工艺设备及施工技术的优化、动态科学管理、网络计划、质量计划、职能管理等。
This paper mainly introduces various control measures adopted in the installation process of high-rise and super-high-rise steel structures including the overall site planning,the selection of tower crane,the measuring process,the hoisting order of steel frame,the installation process,the optimization of process equipment and construction technology,the dynamic and scientific management,the network plan,the quality plan,and the functional management,etc.
出处
《科技情报开发与经济》
2012年第1期152-153,共2页
Sci-Tech Information Development & Economy
关键词
高层超高层钢结构
安装控制
工艺设备
测量工艺
high-rise and super-high-rise steel structures
installation control
process equipment
measuring process