摘要
通过对矿区勘察、比较 ,选择了能满足选厂 (末期 )生产要求 ,投资少 ,年经营费用低的第二尾矿库 ,并进行了设计。
Through the investigation and comparison of the mines, the 2nd tailing dam was selected as it could meet the requirement of the concentrator with less investment and low annual operational expenses, and the design was also made.
出处
《冶金矿山设计与建设》
2000年第2期7-8,共2页
Metal Mine Design & Construction
关键词
尾矿库
排水系统
防洪
选址
设计
tailing dam
water drainage system
flood control