期刊文献+

电站枢纽综合出力系数计算及对调度过程模拟的影响 被引量:11

Calculation of Comprehensive Power Output Coefficient of a Hydropower Station and Its Effects on Simulating the Regulation Process
下载PDF
导出
摘要 梯级水电站优化调度是当前大型水电枢纽研究的重要课题,调度方案的优劣对水电站发电效益影响很大。在进行调度方案建模过程中,出力计算是其中的核心问题之一,在以往的枢纽优化调度研究中,优化算法的应用研究占绝对的比重,但大都没有对其中建模的细节有过详细的描述,通过对三峡及葛洲坝梯级枢纽运行数据进行分析,给出枢纽出力系数的相关关系,以期对建模及求解提供较为准确的基础数据,同时,采用机组出力系数关系式对出力计算进行模拟,并对结果进行了初步的分析。 Optimal operation of the cascaded hydropower station is an important subject for the research on the large hydropower com- plex, and the quality of the operation scheme can affect significantly the generation benefits of the hydropower station. During the model- ing of the operation scbeme, calculation of the power outputs is one of the core works. Previous research on the optimal operation of power plants focused on the application of the optimal algorithms,and the development of the model was seldom described. This paper presents the calculations of the power output coefficients of the Three Gorge and Gezhouba power plants based on their operation data, which can provide the accurate data for future modeling of the operation scheme. Moreover, the power outputs for the two plants have been simulated using the proposed new method and the preliminary analysis of the power outputs results is reported.
出处 《南水北调与水利科技》 CAS CSCD 北大核心 2012年第1期14-17,共4页 South-to-North Water Transfers and Water Science & Technology
基金 "十一五"国家科技支撑计划资助项目(2009BAC56B03)
关键词 电站枢纽 出力系数 调度模拟 出力计算 粒子群算法 三峡电站 葛洲坝电站 hydropower plants power output coefficient regulation process simulation power output calculation particle swarmalgorithm Three Gorge plant Gezhouba plant
  • 相关文献

参考文献13

  • 1梅亚东,朱教新.黄河上游梯级水电站短期优化调度模型及迭代解法[J].水力发电学报,2000,19(2):1-7. 被引量:30
  • 2李爱玲.水电站水库群系统优化调度的大系统分解协调方法研究[J].水电能源科学,1997,15(4):58-63. 被引量:23
  • 3蔡治国,张艾东,张娟.三峡-葛洲坝梯级电站两坝间水位优化控制研究及效益分析[J].水力发电学报,2010,29(3):11-17. 被引量:6
  • 4赵振华,周建中,李承军.清江梯级水电站短期优化调度模型研究[J].浙江水利水电专科学校学报,2002,14(4):5-7. 被引量:2
  • 5李想,魏加华,司源,等.清江梯级水电站联合调度研究[A].梯级水库群洪水资源调控与经济运行学术研讨会[C].2011.
  • 6Fangfang. Li, Christine A. Shoemaker, and Jiahua. Wei. N-Level Optimization Model for Daily Operation with Heterogeneous Hydropower Units in Multiple Reservoirs with Application to the Three Gorges-Gezhouha Cascade Power Stations[C]. Bearing Knowledge for Sustainability Proceedings of the 2011 World Environmental and Water Resources Congress.
  • 7Yeh W. Reservoir Management and Operations Models: A State-of- the-art Review [J]. Water Resources Research, 1985,21 (12) : 1797-1818.
  • 8Labadie J W. Optimal Operation of Multireservoir: State of the Art Review [J]. Journal of Water Resources Planning and Management, 2004,130(2) : 93-111.
  • 9Catal o J P S,Mariano S J P S,Mendes V M F,et al. Nonlinear Optimization Method for Short-term Hydro Scheduling Considering Head-dependence[J].European Transactions on Electrical Power, 2008,20(2) : 172-183.
  • 10Nanda J. Optimal Hydrothermal Scheduling with Cascaded Plants Using Progressive Optimality Algorithm [J]. IEEE Transaction on Power Systems, 1981,100 (4) : 2093-2099.

二级参考文献15

共引文献79

同被引文献88

引证文献11

二级引证文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部