某工程土方填筑变更处理发生争议,存在不同观点。基于招标投标法及合同法所确定的公平合理、诚实信用原则,以及工程建设风险共担原则,结合招标文件与投标文件的法律效力,分析了该变更成立的条件,提出风险共担问题。同时,对由于招投标和合同管理工作做了进一步思考,强调了正确认识投标文件效力和合同文件效力顺序的重要性,从招标准备、招标过程、风险合理转移及合同争议处理等方面,对招投标管理和合同管理工作提出了建设性意见。
Different controversial views are present when there are changes on landfill of an engineering project. Based on the principles of fairness and j ustifiableness, honesty and credibility, and shared risks on engineering construction determined by the Bidding Law and Contract Law, and also according to the legal effects of the Invitation to Tender and the Submission of Tender documents,this paper discusses the conditions justifying these changes and proposes the shared risks. Meanwhile, the manage- ment of the bidding and contract is further investigated, and the importance of a correct understanding of the priority order for the efficiency of the bidding and contract documents is emphasized. This paper presents the constructive suggestions for the bid- ding and contract management in terms of the aspects of tendering preparation, tendering process, reasonable risk transfer, and resolutions for contract disputes.
出处
《南水北调与水利科技》
CAS
CSCD
北大核心
2012年第1期158-160,共3页
South-to-North Water Transfers and Water Science & Technology
关键词
工程变更
情势变更
公平合理
风险共担
招投标管理
合同管理
engineering change
change of circumstances
principle of justice and equity
shared risks
bidding management
con-tract management