分析郑西客运专线采用的道岔融雪系统方案,从工程设计的角度,举例分析道岔融雪系统工程设计中需要注意的沟槽预留、室外设备接地及安装、控制终端的设置及电源要求等几个问题,并提出一些解决方案和思路。
Based on the analysis of the scheme to the switch heating system for Zhengzhou-Xian Passenger Dedicated Line,the paper analyzes matters needing attention such as reserve channels,trackside equipment earthing and installation,the configuration and power supply of the control terminal in the switch heating system project,and puts forward some technical solutions.